Departments, tasks, and phases
Trip tasks group by department. Inside each department, tasks group by phase. Both lists come from real enums in the code, so they'll always look the same.
Seven departments: Bridge, Engineering, Electrical, Deck, Hull, Interior, Safety. Three phases: Pre-departure, Underway, Post-operation. Tap a department tile on Trip Detail to open its drawer.
Steps
-
Departments
Bridge (routing, weather, comms). Engineering (fuel, bilge, generator). Electrical (power, batteries, inverters). Deck (lines, tender, washdown). Hull (hull, paint, through-hulls). Interior (guest setup, provisioning). Safety (life raft, EPIRB, fire, MOB). Trip Detail lists all seven in that order. There is no Galley or Owner department.
-
Phases
Pre-departure, Underway, Post-operation. Three phases — no 'Anchored' phase. The drawer sorts phases in this order.
-
Stat tiles
Inside a department drawer, tap a stat tile to filter: Total, Done, Open (not yet complete), or Blocked. Tap Total to clear the filter.
-
Checklist inside a task
Each task can hold a checklist. Tap a task to expand it; the chip shows done/total.
-
What's NOT on a task
No photo attachment on a task (those live on observations + leg + document vault). No task-level comments.
Related
- Inside a trip — what every section meansTour the Trip Detail screen.
- Reassign a task to someone elseTap-and-hold a task to reassign it across roles. By default the owner, a manager holding Owner authority and a captain whose Captain may edit is on; the owner can give the key to someone else, crew included. Vendors and guests never.