Departments, tasks, and phases

Trip tasks group by department. Inside each department, tasks group by phase. Both lists come from real enums in the code, so they'll always look the same.

Seven departments: Bridge, Engineering, Electrical, Deck, Hull, Interior, Safety. Three phases: Pre-departure, Underway, Post-operation. Tap a department tile on Trip Detail to open its drawer.

Steps

  1. Departments

    Bridge (routing, weather, comms). Engineering (fuel, bilge, generator). Electrical (power, batteries, inverters). Deck (lines, tender, washdown). Hull (hull, paint, through-hulls). Interior (guest setup, provisioning). Safety (life raft, EPIRB, fire, MOB). Trip Detail lists all seven in that order. There is no Galley or Owner department.

  2. Phases

    Pre-departure, Underway, Post-operation. Three phases — no 'Anchored' phase. The drawer sorts phases in this order.

  3. Stat tiles

    Inside a department drawer, tap a stat tile to filter: Total, Done, Open (not yet complete), or Blocked. Tap Total to clear the filter.

  4. Checklist inside a task

    Each task can hold a checklist. Tap a task to expand it; the chip shows done/total.

  5. What's NOT on a task

    No photo attachment on a task (those live on observations + leg + document vault). No task-level comments.